Non-hydraulic lime
England in 2008, defines non-hydraulic lime (or putty lime) as: ‘Lime which will not set by chemical reaction with water but requires exposure to carbon dioxide in the air in order to harden. Unlike hydraulic limes (see Hydraulic lime), it is derived from pure limestone. It is commercially available in powder (hydrated) or putty form.’
Short Guide, Lime Mortars in Traditional Buildings, published on 1 March 2013 by Historic Scotland, defines putty lime as a: ‘Hydrated lime binder that has been slaked with an excess of water forming a wet paste that can be left to mature over time.’
Society for the Protection of Ancient Buildings (SPAB) definition online Glossary defines lime putty as: 'Calcium hydroxide (Ca(OH)2) formed as a paste when a non-hydraulic or weak (NHL 2) hydraulic lime is slaked in an excess of water and the milky suspension is allowed to settle. Can also be made by mixing hydrated lime (the form widely available in builders' merchants) and water, although this gives a less workable mix with inferior plasticity and binding properties.'
See also: Hydraulic lime.
[edit] Related articles on Designing Buildings
Featured articles and news
From studies, to books to a new project, with founder Emma Walshaw.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.